Activity Standard
Records: 7
| ID | Maintenance Activity | Description | Restoration Standard | Work Preparation | Work Operations |
|---|---|---|---|---|---|
| 1 | Pothole Patching | Current activity standard for Pothole Patching. | Patch trimmed to sound material, tack coated, comp... | Mark out extent; arrange traffic control; confirm ... | Square up and trim hole -> remove water and loose ... |
| 2 | Emulsion/Aggregate Patching | Current activity standard for Emulsion/Aggregate P... | Patched area uniformly covered, aggregate embedded... | Confirm emulsion temperature and aggregate stockpi... | Clean surface -> apply emulsion -> spread aggregat... |
| 3 | Heavy Patching | Current activity standard for Heavy Patching. | Failed pavement removed to sound base; replacement... | Confirm extent by proof rolling; arrange traffic c... | Saw-cut and excavate failed area -> replace and co... |
| 4 | Crack Sealing | Current activity standard for Crack Sealing. | Cracks cleaned and sealed full length; sealant flu... | Select sealant grade for climate; verify crack wid... | Rout/clean cracks -> dry -> apply sealant -> detac... |
| 5 | Edge Repair | Current activity standard for Edge Repair. | Edge drop-off eliminated; shoulder graded to match... | Confirm material source; arrange traffic control f... | Trim broken edge -> place and compact patch/should... |
| 6 | Clear Culverts & Pipes | Current activity standard for Clear Culverts & Pip... | Culvert barrel, inlet and outlet free flowing; sil... | Check for protected fauna before clearing; confirm... | Inspect barrel -> remove debris and silt -> check ... |
| 7 | Guardrail Repair | Current activity standard for Guardrail Repair. | Rail restored to original alignment, height and fi... | Match rail profile and post type; check undergroun... | Remove damaged sections -> replace posts/blocks ->... |
1 : 7 : 7
of 1