Common Workflows
Step-by-step tasks, plus the scripted demo storylines in the seed data
Everyday Tasks
Record an inspection
- Inspections & Observations → Inspection → Create
- Choose the Road Section from the lookup (sections display as "18A-01 - Western Hwy — Town Reach")
- Set inspection type (Scheduled / FollowUp / Complaint / Incident / JointAssessment), method, date and inspector
- Save. Defects found during the inspection are added as Defect Observations linked to it.
Record a defect
- Defect Observation → Create
- Pick the Defect Sub Type (e.g. PH02 for a large pothole), the Road Section and optionally the Inspection it came from
- Enter measurements (length, width, depth, count, area, quantity) and set the source type
- Save with status Observed.
Assess a defect
- Select the observation → Defect Assessment child tab → add an assessment
- Pick the matching Intervention Rule (sub-type × road category), the priority, and the weightings
- Calculated score = corporate × field weighting; set the response due date from the rule's response time
- Update the observation status to Assessed (then Logged once it enters the defect log).
Plan and order work
- Check Valid Defect Activity for the permitted repairs for the defect's sub-type
- Create a Planned Work record (activity, quantity, unit rate → estimated cost)
- Create a Work Order from it; record execution under the work order's Work Execution child tab
- Verify with a Completion Inspection, then create the Defect Closure and set the observation status to Closed.
Demo Storylines (in the seeded data)
A — A pothole's complete lifecycle ★
OBS-2026-0201: 450 mm pothole at the Boundary Creek bridge approach, found by inspection INS-2026-0032.
Follow it: Inspection INS-2026-0032 → child tab shows the observation → its assessment (PH02 × CAT1 rule, score 10×8 = 80, 2-day response) → log entry (Fixed) → planned work (Heavy Patching 103, 4.5 m²) → Work Order WO-2026-0140 (coldmix make-safe same day, then permanent heavy patch) → execution by DP Crew 2 → completion inspection Pass → closure Rectified. Follow-up inspection INS-2026-0044 is already scheduled to check the patch after three months.
B — Priority 1 Hazard, still in flight
OBS-2026-0205: guardrail struck over 12 m below the lookout. Priority 1 — mandatory action, 24-hour response, field weighting not applied. Emergency WO-2026-0143 is InProgress: 6 of 12 m of rail fitted, remainder on backorder, site signed and made safe.
C — Backlog: when funding runs out
OBS-2026-0202: 40 m² crocodile cracking in the school zone. Log entry CarriedForward; the Defect Backlog record explains why (routine budget exhausted, deferred to reseal programme RESEAL-2027-DP-04) with review and target dates. The Planned Work entry sits at Deferred.
D — Below intervention level: monitoring
OBS-2026-0210: worn centreline, below the initial intervention level — status Monitoring, no assessment, no log entry. The rules say wait; the system records it and waits.
E — The rules are data
Reference Library → Intervention Rule: the two PH02 rows show a 2-day response on CAT1 vs 7 days on CAT3. Valid Defect Activity shows the pothole's repair options. Maintenance Activity 103 → Activity Standard holds the restoration standard and work operations. A new guideline edition is a data load, not a software release.
A fuller manual with a timed 10-minute demo run sheet: User Manual & Demo Guide.